WACB 860AM

Apple City Broadcasting

  • News
  • Sports
  • Rick’s Blog
  • Contact Us
  • WTLK 1570AM

Expansion At Iredell Memorial Hospital Begins Soon

April 9, 2023 By Richard C. Gilbert

Iredell Health System will soon begin the first phase of its expansion at Iredell Memorial Hospital, increasing the size of both the Emergency Department and the Critical Care Unit.

As construction begins, traffic flow around certain areas will be limited. Beginning Wednesday, April 12 at 8am, members of the public coming to the hospital for services in the Emergency Department, Imaging, or visiting an individual in the patient tower, should enter those designated parking areas (Lot E) by utilizing the entrance off of Brookdale Drive. Entrance to those areas will not be accessible from Hartness Road. Parking areas at the hospital’s main entrance (Entrance A) will remain open as usual.

Iredell Health System plans to expand the emergency department (ED) by 4,805 square feet and the critical care unit (CCU) by 11,195 square feet. The project will also include the renovation of the existing CCU. The ED will expand into the current emergency physician parking lot, and the expanded CCU will be built on top of that expansion.

The ED expansion will include the addition of 10 new treatment spaces, including several new exam rooms, three spacious critical care rooms for patients needing that level of care upon entering the emergency department, as well as four secure behavioral health holding rooms, with a special entrance and exit for patient privacy.

Iredell Memorial Hospital’s CCU currently has 16 rooms. After the expansion, the CCU will have 27 total rooms, with four rooms containing special bariatric ceiling lifts. The lifts make it easier for caregivers to safely lift and transfer all patients. Additionally, all 11 of the new rooms are capable of transforming into negative pressure isolation rooms, in case of the surge of a highly contagious disease, like COVID-19. In the second phase of the project, the existing CCU will be renovated with all new state-of-the-art equipment, beds, and larger patient rooms.

The exterior portion of the expansion is expected to be completed in summer of 2024, with interior renovations completed by the end of 2024.

Share this post:

  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on X (Opens in new window) X
  • Click to email a link to a friend (Opens in new window) Email
  • Click to print (Opens in new window) Print

Latest News

  • Statesville Resident Arrested In Alexander County
  • Hough And Wilson Prep Win State Football Titles
  • ACHS Junior Varsity Basketball Teams Earn Wins
  • Stony Point Man Just Out Of Prison Arrested On Wednesday
  • Newton Man Sent To Prison For Machete Attack
  • Greenway
  • PJ's Seafood & Steak
  • Johnny Watts Insurance Agency - Life, Health & Medicare - Taylorsville, NC
  • Hendren Insurance Agency, Inc.
  • Russell Well Drilling- russellwelldrilling.com
  • Benfield Agency

Apple City Broadcasting
133 E Main Ave Taylorsville, NC 28681
(828) 632-4621

FCC Applications